Construction

Up launcher HS cam Construction PRACTICE at the GAME OTHER launchers Build TEAM MEDIA PGE Beavers PGE PARK 2010


2" black pipe threaded 16" long

Honker TechEd task
is to build
a t-shirt launcher for the
DEC 12 blazer game

Partners:

  • INTEL
  • PORTLAND TRAILBLAZERS
  • Garland Manufacturing Company
  • INSITU
  • ace hardware
     

Valve Body

  • Cut 2" holes in Freon tank

  • Cut ports in black pipe
    near the end

  • Weld ported pipe
    into Freon tank

  • machine smooth
    (thanks ASAP Fab for the
     use of the large lathe)

Valve Core

  • cut UHMWPE to length

  • turn in lathe to .010"
    inside diameter of valve body

  • cut groove for o-rings
    (thanks Arlington Parts
    for use of Small Lathe)

  • assemble plunger mechanism
     and set lock nuts for
    open and closed position

  • lube piston and O-rings
     with silicon grease

see the WIKI for rules and discussion


Lathe work on valve BODY ASAP


UHMWD polyethylene (same stuff as cutting boards only in a rod

1" x 2" ports (3 total)

Closed (push)

 


Open (pull)


Lathe work on second valve core (APSF)
the first one did not fit the inner valve body dia.


valve core assembly

COMPLETE build Document in PDF
submitted to Intel for contest
CLICK HERE (adobe reader required)

BREECH LOADER- the only mechanism like it at the contest. allowed for 10 second load/launch cycle time.
Slide open.....LOAD projectile ...Slide Closed------->FIRE


 

Muzzle brake reduces tumble of t-shirt and increases range.  7/8" holes finished filed before paint


 