SPINDLES

Up BUILD TEAM TEAM THANKS CHASSIS ENGINE CAGE SEATS CONTROLS CONSOLE SIGNALS FLOOR PARTS PARTS 2 FRONT END STEERING BRAKES SPINDLES MOTOR 1 MOTOR 2 930 ADAPTER 930 AXLES DRIVETRAIN REAREND SHOCKS ELECTRIC 1 ELECTRIC 2 UPDATE 4-16 UPDATE 5-2 UPDATE 5-24 UPDATE 6-6 UPDATE 6-12 TEST DRIVE I MRC PAINT PAINT I REASSEMBLY I REASSEMBLY II AUGUST 26 TEST DRIVE II IN THE FIELD FIELD TEST PRICELESS

insert bushing
  • Obtain Through bolts, bushings & nuts, Combo Spindles, Shim/bushing Kit, HD Link Pins, & Trailing Arms

  • Insert bushings into spindles hole to the inside

  • Install through bolts bushings and trailing arms

  • Level trailing arms and measure vertical offset (ours was 5.5mm)

  • Shim pins according to offset chart see HERE

  • Insert pins and shims

  • Make sure spindles have same link pin angles... YES there is a backwards way to do it and the bolts wont line up straight-rotate 180 degrees, re-insert

  • assemble:  Pin head-shims-spindle-shims-trailing arm-o'ring-keeper-nylock nut

  • insert pin bolts

  • snug to fit

shim
check fit visual check
level ready for grease and wheels assemble

 

 Page maintained by MRC    Last modified 07/21/2010