FEB 7

Up BUILD TEAM LIVE BUILD CAM CHASSIS MOCK UP FEB 7 FEB 21 WALKAROUND ROLLING CHASSIS APRIL 11 LATE MAY JUNE REASSEMBLY REASSEMBLY II FINAL Assembly ACTION HORSFALL 08 JULY 30 CONTROLS FLOOR WHEELS-TIRES TRANS CONVERSION DRIVETRAIN FOA Shocks ELECTRICAL ENGINE 1 ENGINE 2 COOLING FUEL CELL EXHAUST ENGINE PULL FRONT END REAR HUB REAR SUSPENSION SEATS ACCESSORIES COLORS PARTS LIST Columbia HS Visit BUILD TEMPLATE

  • Floor bolted in
  • Rear hubs installed
  • Axles and hydraulics SOON
  • Ready for shock install
  • Seats in place for cutter and shifter placement
  • Steering and pedal setup for average rider
  • CNC pedal set on slide plate

Back to the SHOP pages

www.honkernet.net/ahs

last modified 07/21/2010

BY MRC