FLOOR

Up BUILD TEAM LIVE BUILD CAM CHASSIS MOCK UP FEB 7 FEB 21 WALKAROUND ROLLING CHASSIS APRIL 11 LATE MAY JUNE REASSEMBLY REASSEMBLY II FINAL Assembly ACTION HORSFALL 08 JULY 30 CONTROLS FLOOR WHEELS-TIRES TRANS CONVERSION DRIVETRAIN FOA Shocks ELECTRICAL ENGINE 1 ENGINE 2 COOLING FUEL CELL EXHAUST ENGINE PULL FRONT END REAR HUB REAR SUSPENSION SEATS ACCESSORIES COLORS PARTS LIST Columbia HS Visit BUILD TEMPLATE


jig to hold the tabs in place for tacking
  • 1/8" tabs for the diamond plate in the front
  • formed tabs for the skid pan under the seats and the read portion of the cockpit
  • 1/4" aluminum diamond plate for the front area
  • 16 gauge flat steel for the skid pan under the seats (roll on Herculiner or similar to treat it and reduce vibration and seal the steel)
 

Plenty of support in the front for the Diamond plate

"the bell rang Dustin!"
 "almost done MRC, one more tab..."

good templates make the job easy
that and a carbide tip Circular saw blade!

...like a glove

1 plate drilled, the rear pan fitted and marked.  will be drilled or punched for drainage

DUSTIN and ED drop in the front plates and bolt them in with 5/16 carriage bolts

Rear Floor pan ready for install
16 gauge flat steel-to be Herculined

Casey and Ed welding out the
bottoms of the Floor tabs

diamond plate inset
with controls set on top

rear pan bolted in place
then quickly covered with the seats

Back to the SHOP pages

www.honkernet.net/ahs

last modified 07/21/2010

BY MRC