CONTROLS

Up BUILD TEAM LIVE BUILD CAM CHASSIS MOCK UP FEB 7 FEB 21 WALKAROUND ROLLING CHASSIS APRIL 11 LATE MAY JUNE REASSEMBLY REASSEMBLY II FINAL Assembly ACTION HORSFALL 08 JULY 30 CONTROLS FLOOR WHEELS-TIRES TRANS CONVERSION DRIVETRAIN FOA Shocks ELECTRICAL ENGINE 1 ENGINE 2 COOLING FUEL CELL EXHAUST ENGINE PULL FRONT END REAR HUB REAR SUSPENSION SEATS ACCESSORIES COLORS PARTS LIST Columbia HS Visit BUILD TEMPLATE


  • CNC hydraulic pedal assembly
    with throttle
  • CNC dual handle cutting brakes 
  • CNC 648L rear hubs
  • T-handle Shifter
  • Grant 400 steering wheel
  • Offroad Rack and Pinion

Casey and TY work
on installs


slide pedal installed


shifter and cutter installed

 


 

Back to the SHOP pages

www.honkernet.net/ahs

last modified 07/21/2010

BY MRC