COOLING

Up BUILD TEAM LIVE BUILD CAM CHASSIS MOCK UP FEB 7 FEB 21 WALKAROUND ROLLING CHASSIS APRIL 11 LATE MAY JUNE REASSEMBLY REASSEMBLY II FINAL Assembly ACTION HORSFALL 08 JULY 30 CONTROLS FLOOR WHEELS-TIRES TRANS CONVERSION DRIVETRAIN FOA Shocks ELECTRICAL ENGINE 1 ENGINE 2 COOLING FUEL CELL EXHAUST ENGINE PULL FRONT END REAR HUB REAR SUSPENSION SEATS ACCESSORIES COLORS PARTS LIST Columbia HS Visit BUILD TEMPLATE

  • BeCool Aluminum Radiator
  • MrGasket flex line
  • Resevoir shock brackets holding the coolant hose in place
  • 16 inch fan with thermostat
    (not pictured yet)
  • swivel water neck

MAY 30

Chris ran the radiator lines parallel to the chassis
secured with res shock clamps(billet)
     

Back to the SHOP pages

www.honkernet.net/ahs

last modified 07/21/2010

BY MRC