ROLLING CHASSIS

Up BUILD TEAM LIVE BUILD CAM CHASSIS MOCK UP FEB 7 FEB 21 WALKAROUND ROLLING CHASSIS APRIL 11 LATE MAY JUNE REASSEMBLY REASSEMBLY II FINAL Assembly ACTION HORSFALL 08 JULY 30 CONTROLS FLOOR WHEELS-TIRES TRANS CONVERSION DRIVETRAIN FOA Shocks ELECTRICAL ENGINE 1 ENGINE 2 COOLING FUEL CELL EXHAUST ENGINE PULL FRONT END REAR HUB REAR SUSPENSION SEATS ACCESSORIES COLORS PARTS LIST Columbia HS Visit BUILD TEMPLATE

MARCH 3

  • checked the toe in on the front end
  • tightened the suspension and lug nuts
  • installed the shocks AND
  • dropped the project on its suspension
  • the first HUMAN powered test drive!
  • SMILES ALL AROUND!!!!

Back to the SHOP pages

www.honkernet.net/ahs

last modified 07/21/2010

BY MRC

//google analytics script