FOA Shocks

Up BUILD TEAM LIVE BUILD CAM CHASSIS MOCK UP FEB 7 FEB 21 WALKAROUND ROLLING CHASSIS APRIL 11 LATE MAY JUNE REASSEMBLY REASSEMBLY II FINAL Assembly ACTION HORSFALL 08 JULY 30 CONTROLS FLOOR WHEELS-TIRES TRANS CONVERSION DRIVETRAIN FOA Shocks ELECTRICAL ENGINE 1 ENGINE 2 COOLING FUEL CELL EXHAUST ENGINE PULL FRONT END REAR HUB REAR SUSPENSION SEATS ACCESSORIES COLORS PARTS LIST Columbia HS Visit BUILD TEMPLATE


Casey sizing up the rear
  • FOA Shocks
    Piggyback for the rear
    and remote for the front
  • Blue Coil 16 x150 front
  • Blue coil 
    12" 300lb upper
    16" 400lb lower

Ed and Ty assembling the front

on the ready

Chris assembling the rear

finding the right location

mocked up for upper mount fab
and reservoir location

Shocks installed and supporting the weight of the chassis MARCH 3


Back to the SHOP pages

www.honkernet.net/ahs

last modified 07/21/2010

BY MRC