MARCH 18

Home Up BUILD TEAM MEDIA SHOPCAM SANDFEST 2011 JUNIPER 2011 MARCH 4 MARCH 18 APRIL 8 SHAKEDOWN REASSEMBLY START CABIN1 FRONTEND REAR SUSPENSION WHEELS ENGINE DRIVETRAIN REAR CAGE BUILD template


brain in the BOX.. YAY YAY


slide pedal options


nice weld... ED or TY?

MARCH 18, and spring break has a grip on our builders... NUFF SAID


spreader built to equalize tie rods and control arms


coilover airshock

 

 


cooler and fuel cell mount
thanks for the help on those BRIAN!

 

Page maintained by HonkerTech
last modified on 03/21/2011
email SHOPTEACHER at
acunning@arlington.k12.or.us

BACK to the SHOP