IBEX 1

Home Up OCT-NOV 2014 December 2014 RC OUTDOOR 1 RC WRAITH RC INDOOR C1 [ IBEX 1 ] IBEX 2 IBEX 3 IBEX 4 GRILL REAR SUSP FRONT SUSP ROLLING CHASSIS CONTROLS DASH RECOVERY TCASE INTERIOR ENGINE REBUILD ENGINE FUEL DANA 60 STEER UPGRADE DANA 70 DANA 70 CONV TIRE DAY Media Build Template

Phase one of the Ibex Chassis Build


vivid instructions
  • Unpack the kit from Goatbuilt
  • Build jig out of 2x4 steel and fit the fixture kit
    (make it perfect.... it matters)
  • Find the bundles package for this step
  • Follow the directions for fit
  • Drew makes it easy with the diagrams,
    laser cut tubes, and fixture pieces

mechanical pieces sourced at this point

  • TH400 trans with manual valve body
  • 205 transfer case
  • Dana 60/70 axle set out of a 2003 dodge 1 ton

2x4 tube rectangle with some fixture pieces

mandrel bent tubes, laser cut components

at this point we are at the end of step 2
http://goatbuilt.com/building-the-ibex/


laser cut tube ends... precise fit and finish

big box of parts
 
our jig with the step 2 fixtures

 

last modified 12/20/2014

BY MRC and Crew

//google analytics script