PANELS

Up BUILD TEAM CAR SHOW Horsfall1 Horsfall2 FUNDRAISER CAUGHT in the ACT LIVE BUILDCAM JAN/FEB MARCH/APRIL MAY JUNE ALIVE SHAKEDOWN 1 ENGINE Electrical 1 Electrical 2 CHASSIS FAB FLOOR Suspension Explained CHASSIS arrival REAR SUSPENSION REAR CAGE JAXWORKS SEATS Steering DRIVETRAIN SHOCKS TRANSAXLE LIGHTS PANELS WHEELS/TIRES APRIL 19 2010 Trailer Build Template

  • 16 Gauge Aluminum
  • Attached with welded on tabs
     and secured with bolts
  • Sheared by Ross Machine
    to specs from honkershop
  • Install June 26... 7-9 pm
    Andrew, Freddy, and MRC
  • Powder will be same as tube

Back to the SHOP pages

www.honkernet.net/ahs

last modified 07/21/2010

BY MRC

//google analytics script