2010 Dual Sport Off-road Tube Frame Rail

April 8

Up DESIGN LIVE BUILDCAM BUILD TEAM 2010 CARSHOW HORSFALL sept10 FAB 2 DELIVERY JAN 29 CHASSIS PRP seats FRONT SUSPENSION REAR SUSPENSION SHOCKS WHEELS/TIRES INSTRUMENTATION ELECTRICAL LIGHTS ENGINE 1 DRIVETRAIN MARCH 19 April 8 APRIL 29 JUNE10 TEST DRIVE JUNIPER PANELS TEARDOWN POWDER REASSEMBLY Build Template

APRIL 8
  • light bar in process..
  • front suspension tacked in place and
    cycled for bump steer - MINIMAL
  • front suspension shock mounts this week
  • seat belts installed and control locations finalized
  • holes cut for dash and ready for final fitting
  • Radiator core support in.. looking for lines
  • hydraulics soon... then it rolls under its own power

 

 

   

Back to the SHOP pages

www.honkernet.net/ahs

last modified 07/21/2010

BY MRC

//google analytics script