2010 Dual Sport Off-road Tube Frame Rail

BUILD TEAM

Up DESIGN LIVE BUILDCAM BUILD TEAM 2010 CARSHOW HORSFALL sept10 FAB 2 DELIVERY JAN 29 CHASSIS PRP seats FRONT SUSPENSION REAR SUSPENSION SHOCKS WHEELS/TIRES INSTRUMENTATION ELECTRICAL LIGHTS ENGINE 1 DRIVETRAIN MARCH 19 April 8 APRIL 29 JUNE10 TEST DRIVE JUNIPER PANELS TEARDOWN POWDER REASSEMBLY Build Template

Casey

Freddy

Ed

Dustin

Ty

MRC

 

BUILD team for 2010  (named left clockwise)


January 2010  build team receives a check from Cargill/IBR

Dusty

Evan

Chris

Lupita

Bobbie

Lupita

Cody

Curtis

Evan

Freddy


Click image to see larger picture of APRIL build team
APRIL 24, chassis is almost rolling on own suspension
 

Casey

Ty

Chris

Bobbie

     
     

Back to the SHOP pages

www.honkernet.net/ahs

last modified 07/21/2010

BY MRC

//google analytics script