2010 Dual Sport Off-road Tube Frame Rail

PANELS

Up DESIGN LIVE BUILDCAM BUILD TEAM 2010 CARSHOW HORSFALL sept10 FAB 2 DELIVERY JAN 29 CHASSIS PRP seats FRONT SUSPENSION REAR SUSPENSION SHOCKS WHEELS/TIRES INSTRUMENTATION ELECTRICAL LIGHTS ENGINE 1 DRIVETRAIN MARCH 19 April 8 APRIL 29 JUNE10 TEST DRIVE JUNIPER PANELS TEARDOWN POWDER REASSEMBLY Build Template


Tube prior to a-arms and Paneling


Tabbed with Dzus Tabs for spring clip buttons

hood installed with complete dash

Hit it until it changes tone.. then hit it once more.

Makes it feel like a real car.

upper dash laid in

paper templates for AL shearing

wing

wing side

dash and internal

hood and back dash

Vinyl panels for testing


fitting the vinyl for tomorrow's run


aluminum template

fitting the AL

the template was close.. now it is right on

inside

fitting and custom install

side panels done

P40 panels with AVG star and Flying Tiger signature teeth
thanks Sandman and DAD for all your help!

inside

 

Back to the SHOP pages

www.honkernet.net/ahs

last modified 07/24/2010

BY MRC

//google analytics script