IBEX 1

Phase one of the Ibex Chassis Build

IBEX 1

vivid instructions

  • Unpack the kit from Goatbuilt

  • Build jig out of 2x4 steel and fit the fixture kit (make it perfect.... it matters)

  • Find the bundles package for this step

  • Follow the directions for fit

  • Drew makes it easy with the diagrams,
    laser cut tubes, and fixture pieces mechanical pieces sourced at this point

  • TH400 trans with manual valve body

  • 205 transfer case

  • Dana 60/70 axle set out of a 2003 dodge 1 ton

IBEX 1

2x4 tube rectangle with some fixture pieces

mandrel bent tubes, laser cut components

mandrel bent tubes, laser cut components


at this point we are at the end of step 2

at this point we are at the end of step 2
http://goatbuilt.com/building-the-ibex/

laser cut tube ends... precise fit and finish

laser cut tube ends... precise fit and finish

big box of parts

big box of parts


our jig with the step 2 fixtures

our jig with the step 2 fixtures